Late design changes cut 38%
Reads specs, drawings and change orders to catch the requirement conflict before it reaches the shop floor.
What EngineeringIQ is
Spec conflicts caught before the shop floor.
−38%
Late design changes
Conflicts caught pre-release
11 days
ECO cycle time
From 26 days
$1.4m
Avoided rework / yr
Illustrative, single programme
The business challenge
Everything takes too long — ECO cycle from 26 days to 11 with automated impact. Rework and errors cost us — Catches tolerance and spec conflicts before tooling. Audits are painful — Immutable finding history for design reviews.
The problem
The conflict is found in production, not in review.
- Requirements live across specs, drawings, BOMs and supplier PDFs.
- ECO impact is assessed by whoever remembers the dependency.
- One missed tolerance clash costs a tooling cycle.
What the app does
Machine-checked traceability across every engineering artefact.
- Requirements extracted and linked to parts, tests and suppliers.
- Conflicts and orphan requirements surfaced before release.
- ECO blast radius computed in minutes, with evidence.
01
Traceability graph
Requirements linked to parts, tests and suppliers across specs, drawings, BOMs and PDFs.
02
Conflict checks
Cross-artefact rules surface tolerance clashes and contradictions before release.
03
Coverage gaps
Finds untested requirements and unreferenced supplier datasheets — the usual audit findings.
04
ECO impact
Computes the blast radius of a change in minutes, with citations to every affected clause.
05
CAB packages
Generates review-ready impact documents so boards decide once instead of looping.
06
On-prem deployment
Runs entirely inside your network; engineering IP never leaves.
EngineeringIQ connects to the systems your teams already run, so it fits the stack rather than replacing it.
- Teamcenter
- Windchill
- SAP PLM
- 3DEXPERIENCE
- Jira
- DOORS
- AutoCAD / SolidWorks exports
- S3 / on-prem stores